In previous installments in this series, I’ve talked about what Product Owners and development team members can do to ensure iteration closure. By iteration closure, I mean that the system is functioning at the end of each iteration, available for the Product Owner to test and offer feedback. It may not have complete feature sets, but what feature sets are present do function and can be tested on the actual system: no “prototypes”, no “mock-ups”, just actual functioning albeit perhaps limited code. I call this approach fully functional but not necessarily fully featured.
In this installment, I’ll take a look at the Scrum Master or Project Manager and see what they can do to ensure full functionality if not full feature sets at the end of each iteration. I’ll start out by repeating the same caveat I gave at the start of the Product Owner installment: I’m a developer, so this is going to be a developer-focused look at how the Scrum Master can assist. There’s a lot more to being a Scrum Master, and a class goes a long way to giving you full insight into the responsibilities of the role.
My personal experience is that the most important thing you as a Scrum Master can do is to watch and listen. You need to see and experience the dynamics of the team.
At Iteration Planning Meetings (IPMs), are Product Owners being intransigent about priorities or functional decomposition? Are developers resisting incremental functional delivery, wanting to complete technical infrastructure tasks first? These are the two most serious obstacles to iteration closure. Be prepared to intervene and discuss why it’s in everyone’s interest to achieve this iteration closure.
At the daily stand-up meetings, ensure that every team member speaks (that includes you!), and that they only answer the three canonical questions:
Don’t allow long-winded discussions, especially technical “solution” discussions. People will tune out.
You’re listening for:
Your task immediately after the stand-up is to speak with team members who have obstacles and find out what you can do to clear the obstacles. Then address any team members who’re always doing the same task every day and find out why they’re stuck. Are they inexperienced and unwilling to ask for help? Are they not committed to the project mission and need to be redeployed?
Guard against an us-versus-them mentality on teams, where the developers see Product Owners or infrastructure teams as “the enemy” or at least an obstacle, and vice versa. These antagonistic relationships come from lack of trust, and lack of trust comes from lack of results. Again, actual working deliverables at the close of each iteration go a long way to building trust. Look for intransigence on either the developer team or with the Product Owner: both should be willing to speak freely and frankly with each other about how much work can be done in an iteration and what constitutes Minimal Value Product for this iteration. It has to be a negotiation; try to facilitate that negotiation.
Know your team as human beings – after all, that is what they are. Learn to empathize with them. How do individuals behave when they’re happy or when they’re frustrated? What does it take to keep Jim motivated? It’s probably not the same things as Bill or Sally. I’ve heard people advocate the use of Meyers-Briggs Personality Tests or similar to gain this understanding. I disagree. People are more complex than 4 or 5 letters or numbers at one moment in time. I may be an introvert today and an extrovert tomorrow, depending on how my job is going. Spend time with people to really know them, and don’t approach people as test subjects or lab rats. Approach them as human beings, the complex, satisfying, irritating, and ultimately rewarding organisms that we actually are.
Occasionally, when I speak at technical or project management meet-ups, an audience member will ask, “I’m a Scrum Manager and I can’t get the Product Owner to attend the IPM; what should I do?” or, “My CIO comes in and tasks my developer team directly without going through the IPM; how do I handle this?” I try to give them hints, but the answer I always give is, “Agile will only expose your problems; it won’t solve them.” In the end, you have to fall back on your leadership and management skills to effect the kind of change that’s necessary. There’s nothing in Scrum or XP or whatever to help you here. Like any other process or tool, just implementing something won’t make the sun come out. You still have to be a leader and a manager – that’s not going away anytime soon.
Before I close, let me point out one thing I haven’t listed as something a Scrum Master ought to be adept at: administration. I see projects where the Scrum Master thinks their primary role is to maintain the backlog, measure velocity, track completion, make sure people are updating their Jira entries, and so on. I’m not saying this isn’t important – it is. It’s very important. But if you’re doing this stuff to the exclusion of the other stuff I talked about up there, you’re kind of missing the point. Those administrative tasks give you data. You need to act on the data, or what’s the point? Velocity is decreasing. OK…what are you and the team going to do about it? That’s the important part of your role.
When we at CC Pace first started doing Agile XP projects back in 2000-2001, we had a role on each project called a Tracker. This person would be part time on the project and would do all the data collection and presentation tasks. I’d like to see this role return on more Agile projects today, because it makes it clear that that’s not the function of the Scrum Master. Your job is to lead the team to a successful delivery, whatever that takes.
So here we are at the end of my series. If there’s one mantra I want you to take away from this entire series, it’s Keep the system fully functional even if not fully featured. Full functionality – the ability of the system to offer its implemented feature set to the Product Owner for feedback – should always come before full features – the completeness of the features and the infrastructure. Of course, you must implement the complete feature set and the full infrastructure – but evolve towards it. Don’t take an approach that requires that the system be complete to be even minimally useful.
If you’re a Product Owner:
If you’re a developer:
If you’re a Scrum Master:
I hope you’ve enjoyed this series. Feel free to comment and to connect with me and with CC Pace through LinkedIn. Please let me hear how you’ve managed when you were on a supposedly Agile project and realized that the sound of rushing water you heard was the project turning into a waterfall.